As of today, we have (19) projects in the works all in different stages of completion. They range from an upcoming consultation, proposal stage, design phase, waiting on product phase, complete and waiting on upcoming install phase. No day is the same at K&K so we thought we give you some insight and story lines behind a few of the projects we are currently working on.

2. A Color Happy Sunroom and Kitchen Refresh

A. Our color crazy and pattern brave client wants to redesign her sunroom which is off her kitchen to be her personal space to read a book, relax and have wine with her girlfriends. i. Recovering (4) Stanleychairs with the colorfulThibautpatterned fabric ii. Console for serving food iii. Statement light fixture

B. Custom made kitchen table to fit a tight space

C. Painting of all cabinetry and new hardware

Cummo.jpg

3. A New Build From the Ground Up

A. A repeat client with (2) teenage daughters and busy medical careers are overwhelmed with the volume of details that need to be addressed. i. Selections – All hard surfaces, vanities, lighting, hardware, paint palette, furnishings ii. Challenges 1. Ceiling fan outside

fullsizeoutput_5576.jpeg
fullsizeoutput_4fd6.jpeg

3. Fireplace design

Screen-Shot-2018-04-23-at-4.35.42-PM.jpg

4. Stairwell light fixture (Currey and Company)

9000-0220.jpg

4. Multi-family Projects – Contract Viable Concentration

A. (3) models in the Buckhead area of Atlanta – details... details... B. (2) Leasing Centers and Clubhouses – functionality, form and quality C. Theatre

150827_014.jpg
150827_030.jpg
150827_065-1.jpg

5.  A New Build In Kiawah, SC

A. Architectural review – time consuming B. Tile selections C. Lighting D. Plumbing

IMG_8688-1.jpg
WM_NW5111VS.png
65061LF-NK-B1.png

Brizo (luxury brand of faucets and fittings)

KK-Ep-16-Quote-e1526035837819.png

Listen to our podcast here and see what the craziest design project we were asked to do!!

Joann